Manufacturing knowledge · 6CProto Guides
Engineering decisions, organised
Manufacturing Application Guides
Work from the application environment, assembly and validation requirements before selecting a manufacturing process.
Updated October 11, 2026 · 38 focused articles
Start from what the part must survive, not from the process list
Every process on this site can make a bracket. What separates the applications is what happens to that bracket afterwards: the documentation an aerospace customer requires, the cleaning and validation a medical device needs, the volume and cost pressure of an automotive programme, the vibration and duty cycle of a robot arm. Those requirements decide the process more often than the geometry does.
A machined aluminium bracket for a test rig, for a satellite and for a hospital bed can share a drawing and still need three different routes. The satellite part needs material certification, traceability and often a five-axis setup to avoid joints. The medical part needs a validated finish and a cleanroom-compatible cleaning route. The test rig part needs to arrive this week at the lowest cost that will not embarrass anyone.

The application changes the drawing, not just the material
Industry requirements land on the drawing as notes and tolerances. A sealing face has a flatness and a surface finish. A moving joint has a clearance range and a wear surface. An enclosure has an EMC or ingress requirement that decides coating and seam design. A medical component has a surface that must be free of burrs, pits and residues, which changes both the machining strategy and the finishing route.
Those notes are what the quote is built from. A drawing that says nothing about the sealing face will be quoted as a general-tolerance part, and the first leak test will explain the difference.

The six groups below follow those questions rather than the industry labels. Read the one that matches the environment, then check the adjacent group when the part crosses a boundary — a medical device with a machined housing, for instance, or an industrial robot with a consumer-grade enclosure.
Where the six application routes diverge
Aerospace and medical diverge on documentation and validation. Automotive and industrial diverge on volume and cost per part. Robotics and consumer electronics diverge on stiffness, weight and cosmetics. The articles below are grouped by those differences, so the useful reading order is to start with the environment the part lives in, then the failure it must not have, then the process that can deliver both at the required quantity.
The articles themselves are grouped by application, not by process. A reader looking for a process answer should start with the process hubs; this page exists for the earlier question of what the part has to withstand and what evidence the customer will ask for.
Find the guide for your next decision
Follow the guide that matches the feature, failure mode or project decision you are working on.
Precision and Perseverance: Crafting the Ideal Smart Lock Panel
A Bespoke Pendant Light: Crafting Perfection Through Innovation and Dedication
Is EV torque driving a friction shims surge?
How Do You Balance Drone Frame Weight and Rigidity?
High-Precision Robotics Component Manufacturing: Lightweighting Strategies That Unlock Speed and Stability (June 2026)
How can you design premium plastic enclosures for consumer electronics?
Medical Device Parts: Precision Custom Components for Diagnostics, Surgical Tools & Devices
Salt Spray Resistance: Specify Coatings, Tests and Acceptance Criteria
High-Performance Plastics: Precision Manufacturing for Demining Engineering Applications
What Are Automotive Plastic Parts and How Are They Made?
How Is Medical Implant Production Done?
How Are Structural Aerospace Parts Manufactured?
How Should You Manufacture Industrial Robot Parts?
What Salt Spray Resistance Does Marine Hardware Need?
Manufacturing for IoT Edge Devices: Enclosures, Thermal, and Antenna Design
Custom Manufacturing for Solar Energy Systems: Inverters, Trackers, and Mounts
Automotive Prototypes: Choosing Processes for Reliable Vehicle Testing
Automotive Engine Components: From Prototype Validation to Repeatable Production
How Do You Choose a Medical Device Prototype Manufacturer?
Rapid Prototyping for Consumer Electronics: EVT, DVT, and PVT
Aerospace Rapid Prototyping: From Concept to Qualified Parts
Low-Volume Manufacturing for Medical Devices: Pilot Runs and Clinical Samples
Low-Volume Manufacturing for Consumer Electronics: Small-Batch Smart Devices
Prototyping for Smart Home Devices: From Sensor Module to Finished Housing
Breaking Through Production Challenges to Create High-Quality LED Lamps: A Success Story
Prototype vs Production Tooling for Medical Devices: When Bridge Tooling Is Enough
Medical Prototype Test Fixtures: Separate Device Parts From Nonclinical Test Hardware
Medical Micro Parts Manufacturing: When the Tolerance Is Smaller Than the Feature
Medical Fabrication: Making Device Components to a Controlled Process
Rapid Prototyping in the Automotive Industry: Faster Builds, Same Validation Gates
Prototype Automotive Development: From Mule to Pilot Build
Automotive Prototyping: What the Stages Are Called and What They Are For
Aerospace Micro Manufacturing: Producing Features Smaller Than the Usual Rules Allow
Custom Aerospace Manufacturing: What a Build-to-Print Supplier Has to Prove
Aerospace Prototyping: Where a Prototype Has to Predict a Qualified Part
Medical Device Prototype Manufacturer: What You Should Receive With the Parts
Choosing Medical Device Prototyping Companies: What to Compare Beyond the Capability List
Custom Industrial Equipment Manufacturing: Specifying Machines That Do Not Exist Yet
Before you release the project
- Define the function, environment and the question this batch must answer.
- Specify material grade, geometry, quantity, finish and the dimensions that control fit.
- Agree the inspection method and the evidence required to accept the parts.
- Record the drawing revision and approval before production begins.
Common planning questions
Should I select a process before defining the application?
Define environment, loads, fit, assembly and validation requirements first. These requirements often eliminate unsuitable materials or processes.
Does a prototype prove regulatory or end-use compliance?
Not by itself. Application-specific testing and the required documentation must be planned separately from manufacturing the sample.
Move from guidance to a reviewed project
Send the CAD model and drawing with material, quantity, finish and inspection requirements. Use the relevant service page to review the available manufacturing route.